| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0001579 | T99X171.00 SKB Eagle | General | public | 2022-12-21 08:46 | 2023-03-17 08:03 |
| Reporter | (ALTech) SH Son | Assigned To | (MFG) An Tran | Due Date | |
| Priority | normal | Severity | s3-moderate | Reproducibility | have not tried |
| Status | closed | Resolution | fixed | ||
| Summary | 0001579: [ALT] Line transfer (migration) | ||||
| Description | ALT FATP Line transfer building from F16 to F07 T99x171.00 (Eagle) and K18X001.00(Swan) both models require a migration plan | ||||
| Tags | No tags attached. | ||||
| Attach Tags | |||||
| User List |
(ALTech) BY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , |
|---|
|
|
Factory migration Plan same as FII's e-mail. |
|
|
Hi An, and Miya Basically the factory(line) migration requires customer approval. and In some cases, on-site factory audit may be required. The factory(line) migration is critical part of manufacturing quality. So, FII should be submit the migration plan first. Not only schedule but detailed engineering plan. The document have to include below contents. • Factory(line)information : before / after • Manufacturing and quality validation plan. • Engineer / worker training plan I remind that T99x171.00 and K18X001.00 both models require a plan So, please prepare the plans and document well we will review and feedback soon. Thanks SON |
|
|
Hi SH Son Please see my comments: • Factory(line) information : before / after ---> As i sent email to ALT, i also showed you before and after. Actually, we only change new building, all devices are no any changes. Could you tell us more detail your requires? • Manufacturing and quality validation plan. ----> I will update later • Engineer / worker training plan -----> They are no any changes. |
|
|
HI An, • Factory(line) information : before / after ---> As i sent email to ALT, i also showed you before and after. Actually, we only change new building, all devices are no any changes.Could you tell us more detail your requires? [ALT] Please update below SMT/PTH line information ME setup plan and layout. FAC & IT setup plan and layout Equipment list and layout plan control run plan • Manufacturing and quality validation plan. ----> I will update later • Engineer / worker training plan -----> They are no any changes. [ALT] Please add job position / names lists to the document. Thanks SON |
|
|
Hi SH Son I want to update ALT FATP Line transfer building from F16 to F07 as the attached file. |
|
|
Hi An, Please add gauge R&R plan for equipment verification step - must include measurement test using golden sample : i.g. TX, RX throughput, LED color, Sound chamber test... : add reference : current line measurement result. - Each mode( T99x171.00 (Eagle) and K18X001.00(Swan)) requires a plan Thanks SON |
|
|
Hi An, Please update your plan about ALT FATP Line transfer building from F16 to F07 0001579:0011597 Thanks SON |
|
|
Hi HS Son I would like to update Gage Repeatability & Reproducibility Report plan as the attachment. Thanks An Tran |
|
|
Hi SH Son I would like to update Gage Repeatability & Reproducibility Report plan as the attachment. Thanks An Tran |
|
|
Hi An, Could you please check again this file? ALT_Milestone transfer F16 to F07 0116-2.ppt (11,254,272 bytes) it is same as last you attached file ALT_Milestone transfer F16 to F07 1228.ppt (10,424,320 bytes) Thanks SON |
|
|
Hi Son Please help to check paper #7, i already updated GR&R plan for Eagle and SWAN. Thanks An |
|
|
HI An Tran can you upload the GR&R report format? please check it, Thanks SON |
|
|
Hi Son I would like to upload the GR&R report format as the attached file. Thanks An Tran |
|
|
Hi An, the GR&R report format is OK, Please upload the GR&R report when the test is finished. Thanks SON |
|
|
Hi An, Please update status, is on going according to your transfer plan?? - ALT_Milestone transfer F16 to F07 0116-2.ppt (11,254,272 bytes) Thanks SON |
|
|
update the schedule from email. |
|
|
Dear Mr. An Tran, We are confuse your new plan. Does control run for SWAN delay only 2 days ? And does control run for Eagle delay 2 weeks ? Could you make same order of items that you provide before.(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1579#c11806) Best Regards, SuhYoung YOON |
|
|
Dear Mr. Suh Young YOON Does control run for SWAN delay only 2 days ? [An] Yes, only delay 2days. We are pushing our process to set up and verify equipment. And does control run for Eagle delay 2 weeks ? [An] We planned to finished 28K(from 02/11~02/20) in current line(at F16) then all equipment will be transfer to new F07 from 02/20. |
|
|
Hi SH son I would like to update SWAN and Eagle as the attached file. Thanks |
|
|
Hi An, Please add detailed control run schedule based on ALT_Milestone transfer F16 to F07 0210 plan. - SMT - PTH - Assembly - FT - OBA - Packing Thanks SON |
|
|
Hi An Tran Please check and reply my request Add detailed control run schedule based on ALT_Milestone transfer F16 to F07 0210 plan. - SMT - PTH - Assembly - FT - OBA - Packing Thanks SON |
|
|
Hi SH son I would like to update SWAN and Eagle as the attached file. Thanks |
|
|
Hi SH son I would like to update SWAN and Eagle as the attached file. Update FATP process from 03/01~03/03 Thanks |
|
|
HI An, 0001579:0012303 I’m preparing for business trip based on this schedule. I will send email about this biz trip soon. Thanks SON |
|
|
Hi SH Son I would like to update line transfer status and audit agenda as the file attachment. Please let me know if have any issues Thanks |
|
|
Dear SH Son I would like to send you SOP Thanks |
|
|
Dear SH Son I would like to send you SWAN SOP, we already updated as audit action. Thanks |
|
|
Dear SH Son I would like to send you SWAN/Eagle GRR. Thanks |
|
|
Dear Mr SH Son I would like to update Eagle line transfer report: 1. BFX-AT100 Control Run New FATP F07-3F Result Report 2. Check Led improve solution plan 3. Eagle line transfer report Thanks |
|
|
Dear Mr SH Son I would like to update SWAN Improment fixture report. Thanks |
|
|
Dear Mr SH Son I would like to update SWAN control run report and line transfer report. Thanks |
|
|
Hi An, Thank you for support about Line transfer report. Could you please upload each control run STB S/N (Eagle 100pcs, Swan 70pcs)? Thanks SON |
|
|
Hi SH Son Eagle SN 100pcs: 2149688001202301066001 ~ 2149688001202301066100 SWAN: SN 70pcs: 2149695001202303000001 ~ 2149695001202303000070 Thanks |
|
|
HI An about SWAN Improment fixture Review-20230302.pptx please more cutting badge area, refer to the attached images Thanks SON |
|
|
Hi SH Son The cutting badge area has been updated as the attached file. Thanks |
|
|
HI An 0001579:0012486 Confirm the SWAN Improvement fixture Thanks SON |
|
|
approved Eagle (T99x171) and Swan(K18x001) FA line transfer F16 to F07 . Close the this ticket. Thank you for all of factory support |
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2022-12-21 08:46 | (ALTech) SH Son | New Issue | |
| 2022-12-21 08:48 | (ALTech) SH Son | Note Added: 0011534 | |
| 2022-12-21 08:48 | (ALTech) SH Son | File Added: ALT_Milestone transfer F16 to F07.ppt | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) Sun Choul Joung | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) Hyunsik Kim | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) BY Lee | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) JW Kim | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) Lonnie Kim | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) SH Son | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) Sophie Lee | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (ALTech) SY Yoon | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (MFG) An Tran | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (MFG) Ben Trinh | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (MFG) Yuri Ruan | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (PM) Dennis Lu | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (PM) Sheila Tu | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (PM) Tiffanie Lai | |
| 2022-12-21 08:49 | (ALTech) SH Son | Issue Monitored: (Sales) Miya Wang | |
| 2022-12-21 09:59 | (ALTech) SH Son | Summary | [Eagle] Factory migration => [ALT] Line transfer (migration) |
| 2022-12-21 09:59 | (ALTech) SH Son | Description Updated | |
| 2022-12-21 10:00 | (ALTech) SH Son | Note Added: 0011536 | |
| 2022-12-21 10:34 | (ALTech) SH Son | Assigned To | => (MFG) An Tran |
| 2022-12-21 10:34 | (ALTech) SH Son | Status | new => assigned |
| 2022-12-21 11:07 | (MFG) An Tran | Note Added: 0011538 | |
| 2022-12-21 11:15 | (SW) Kerwin Chen | Severity | s2-severe => s3-moderate |
| 2022-12-21 11:30 | (ALTech) SH Son | Note Added: 0011540 | |
| 2022-12-28 11:04 | (MFG) An Tran | Note Added: 0011597 | |
| 2022-12-28 11:04 | (MFG) An Tran | File Added: ALT_Milestone transfer F16 to F07 1228.ppt | |
| 2023-01-03 14:29 | (ALTech) SH Son | Note Added: 0011630 | |
| 2023-01-10 11:08 | (ALTech) SY Yoon | Note Edited: 0011630 | |
| 2023-01-16 09:11 | (ALTech) SH Son | Note Added: 0011782 | |
| 2023-01-16 21:20 | (MFG) An Tran | Note Added: 0011805 | |
| 2023-01-16 21:20 | (MFG) An Tran | File Added: ALT_Milestone transfer F16 to F07 0116.ppt | |
| 2023-01-16 21:34 | (MFG) An Tran | Note Added: 0011806 | |
| 2023-01-16 21:34 | (MFG) An Tran | File Added: ALT_Milestone transfer F16 to F07 0116-2.ppt | |
| 2023-01-17 10:32 | (ALTech) SH Son | Note Added: 0011808 | |
| 2023-01-17 10:50 | (MFG) An Tran | Note Added: 0011809 | |
| 2023-01-18 12:50 | (ALTech) SH Son | Note Added: 0011824 | |
| 2023-01-18 14:25 | (MFG) An Tran | Note Added: 0011826 | |
| 2023-01-18 14:25 | (MFG) An Tran | File Added: Tester Approval Sheet by GR&R analysis.xlsx | |
| 2023-01-20 12:25 | (ALTech) SH Son | Note Added: 0011847 | |
| 2023-02-06 09:34 | (ALTech) SH Son | Note Added: 0012008 | |
| 2023-02-07 15:15 | (ALTech) SH Son | Note Added: 0012042 | |
| 2023-02-07 15:15 | (ALTech) SH Son | File Added: ALT_Milestone transfer F16 to F07 0203.pdf | |
| 2023-02-07 19:41 | (ALTech) SY Yoon | Note Added: 0012049 | |
| 2023-02-07 19:55 | (ALTech) SY Yoon | Note Edited: 0012049 | |
| 2023-02-08 14:21 | (MFG) An Tran | Note Added: 0012064 | |
| 2023-02-10 18:38 | (MFG) An Tran | Note Added: 0012125 | |
| 2023-02-10 18:38 | (MFG) An Tran | File Added: ALT_Milestone transfer F16 to F07 0210.ppt | |
| 2023-02-14 12:58 | (ALTech) SH Son | Note Added: 0012169 | |
| 2023-02-20 09:16 | (ALTech) SH Son | Note Added: 0012251 | |
| 2023-02-22 09:27 | (MFG) An Tran | Note Added: 0012301 | |
| 2023-02-22 09:27 | (MFG) An Tran | File Added: ALT_Milestone transfer F16 to F07 0221.ppt | |
| 2023-02-22 10:40 | (MFG) An Tran | Note Added: 0012303 | |
| 2023-02-22 10:40 | (MFG) An Tran | File Added: ALT_Milestone transfer F16 to F07 0222.ppt | |
| 2023-02-23 09:30 | (ALTech) SH Son | Note Added: 0012326 | |
| 2023-02-28 21:01 | (MFG) An Tran | Note Added: 0012382 | |
| 2023-02-28 21:01 | (MFG) An Tran | File Added: ALT audit F07 agenda.ppt | |
| 2023-03-02 19:08 | (MFG) An Tran | Note Added: 0012411 | |
| 2023-03-02 19:08 | (MFG) An Tran | File Added: Eagle ASSY SOP G.xlsx | |
| 2023-03-02 19:08 | (MFG) An Tran | File Added: Eagle PACK SOP H1.xlsx | |
| 2023-03-02 19:08 | (MFG) An Tran | File Added: Eagle TEST SOP G.xlsx | |
| 2023-03-03 12:12 | (MFG) An Tran | Note Added: 0012417 | |
| 2023-03-03 12:12 | (MFG) An Tran | File Added: SWAN TEST SOP B1.xlsx | |
| 2023-03-03 12:12 | (MFG) An Tran | File Added: SWAN ASSY SOP B1.xlsx | |
| 2023-03-03 12:12 | (MFG) An Tran | File Added: SWAN PACK SOP B.xlsx | |
| 2023-03-03 15:31 | (MFG) An Tran | Note Added: 0012426 | |
| 2023-03-03 15:31 | (MFG) An Tran | File Added: SWAN.7z | |
| 2023-03-03 15:31 | (MFG) An Tran | File Added: Eagle.7z | |
| 2023-03-03 19:53 | (MFG) An Tran | Note Added: 0012429 | |
| 2023-03-03 19:53 | (MFG) An Tran | File Added: check Led improve solution plan_03.02.pptx | |
| 2023-03-03 19:53 | (MFG) An Tran | File Added: Eagle Line Transfer Report.pptx | |
| 2023-03-03 19:53 | (MFG) An Tran | File Added: BFX-AT100 Control Run New FATP F07-3F Result Report .pptx | |
| 2023-03-03 19:55 | (MFG) An Tran | Note Added: 0012430 | |
| 2023-03-03 19:55 | (MFG) An Tran | File Added: SWAN Improment fixture Review-20230302.pptx | |
| 2023-03-06 18:42 | (MFG) An Tran | Note Added: 0012442 | |
| 2023-03-06 18:42 | (MFG) An Tran | File Added: BFX-UA300 Line Transfer Report V1 20230306.pptx | |
| 2023-03-06 18:42 | (MFG) An Tran | File Added: BFX-UA300 Control Run New FATP F07-3F Result Report .pptx | |
| 2023-03-07 09:05 | (ALTech) SH Son | Note Added: 0012443 | |
| 2023-03-07 09:32 | (MFG) An Tran | Note Added: 0012444 | |
| 2023-03-08 08:36 | (ALTech) SH Son | Note Added: 0012455 | |
| 2023-03-08 08:36 | (ALTech) SH Son | File Added: image.png | |
| 2023-03-08 08:36 | (ALTech) SH Son | File Added: image-2.png | |
| 2023-03-09 14:14 | (MFG) An Tran | Note Added: 0012486 | |
| 2023-03-09 14:14 | (MFG) An Tran | File Added: SWAN Improment fixture Review-20230309.pptx | |
| 2023-03-10 08:55 | (ALTech) SH Son | Note Added: 0012495 | |
| 2023-03-17 08:03 | (ALTech) SH Son | Status | assigned => closed |
| 2023-03-17 08:03 | (ALTech) SH Son | Resolution | open => fixed |
| 2023-03-17 08:03 | (ALTech) SH Son | Note Added: 0012560 |